Hilf density ratio
WebThe bulk density results show 1.73 kg/m3 and 1.59 kg/m3 for wet and dry densities respectively. The particle size analysis result indicates 17% of gravel and 83% of sand for the dry sieving whilst the wet sieving gives 7% … WebDensity Ratio (DR or RD) for each test site for earthworks or pavement materials stabilised with cementitious binders in-situ: Note 1: VicRoads Sections 290 and 307 use DR for …
Hilf density ratio
Did you know?
WebJun 26, 2024 · Once you’ve entered 20 scores, your Handicap Index is derived by taking the average of your 8 best score differentials — that is, your 8 best scores as measured in … WebJul 20, 2024 · Maximum dry density, along with optimum moisture content, is determined in the laboratory and provides the target for field compaction. 95 percent is often used as a target compaction threshold to ensure that construction …
WebMDD = maximum dry density, in t/m 3 (d) Calculate the moisture ratio (MR) for each dry-back test site, in percent, using: OMC w MR ∗ = 100 (e) Calculate the mean Moisture Ratio (meanMR), in percent, as the mean of the individual site moisture ratios for the lot (mean of 3 or 6 values). (f) Determine the highest individual Moisture Ratio. Web(a) Report the dry density ratio (𝑅𝐷) of the soil to the nearest 0.1 percent. Report all maximum dry density values used in the determination of the dry density ratio (𝑅𝐷), to the nearest 0.001 t/m3. Where the provisions Procedure 3(b)(ii) have been satisfied, report the mean of the maximum dry density 01 t/m3 and standard deviation
Web1289.5.7.1 Method 5.7.1: Soil compaction and density tests—Compaction control test—Hilf density ratio and Hilf moisture variation (rapid method) 1289.5.8.1 Method 5.8.1: Soil compaction and ... WebJul 1, 2006 · AS 1289.5.7.1-2006. 👀 currently. viewing. June 2006. Methods of testing soils for engineering purposes, Method 5.7.1: Soil compaction and density tests - Compaction control test - Hilf density ratio and Hilf moisture variation (rapid method) Most Recent.
WebMethods of testing soils for engineering purposes – Soil compaction and density tests – Compaction control test – Dry density ratio and moisture ratio using statistical selection …
WebApr 18, 2024 · Hilf Density Ratio (%) 103.0 101.0 Compaction Method Standard Standard Moisture Variation Note: Positive values = test is dry of OMC Negative values = test is wet of OMC Report Number: P18038-1 Page 1 of 1. Compaction Control Test Report Report Number: P18038-2 Issue Number: 1 cst85_wblink开发板WebHilf Density Ratio (%) : 99.0 99.5 102.0 101.5 Minimum Specification : Moisture Specification : Site Selection : Civiltest Civiltest Civiltest Civiltest Soil Description : CLAY Sandy Silty, Brown Orange CLAY Sandy Silty, Brown CLAY Silty, Brown SAND Clayey, Orange Remarks : Document Code RF89-34 Accredited for compliance with ISO/IEC 17025. early christian ireland kahootWebAS 1289.5.7.1 - Compaction control test - Hilf density ratio and Hilf moisture variation (Rapid method) AS 1289.2.1.1 - Moisture content of a soil - Oven drying method (Standard method). Sampling: Preparation: 9 Offset 3m from West Boundary 5m from East Boundary 1m from North Boundary 300mm Compactive Effort Peak Converted Dry Density (t/m3) cst92p23bWebHigh Density Poly-Ethylene . Intermediate Igneous Rock ; As defined in AS 1726. Including Trachyte, Trachyandesite, Andesite, Tuffs (of same composition), Syenite and Diorite. … cst 8 to istWebApr 7, 2024 · A yellow force field with varying density is used to illustrate binding strength between peptide and the MHC molecule. Three different cases of TCR recognition level are depicted, including self-recognizing TCR absent because of negative selection, weak-recognizing TCR due to weak MHC binding of presented peptide, and strong recognition … cst92f32WebApr 28, 2013 · The contractor's compaction report submits a test report as Hilf density ratio being 102%. Can this be intepreted as compliant having exceeded the requirement by 2%? … cst 8am to estWebTable 15.3 (b) – Density requirements Application (Reference Clauses) Material Compaction Standard 1 Minimum 2 Maximum 3 Existing Material and Cuttings Insitu material for placement of embankment fill (12.2.1.2, 12.2.1.3, 12.2.3) Existing 95% – Bottom of excavations (13.3.3.4, 13.3.6) Top 300 mm below subgrade level 97% – cst 9145t